Start with the machine details, slurry, dimensions and main problem. If the nameplate or old cloth is unavailable, use the “Unknown” or “New project” route. Add photos and operating details only when you have them.
Quick request In a hurry? Send a quick request first Engineering RFQ Machine details included
Pre-Screening Assistant
Filtration Duty Pre-Screening & Risk Assistant
Pre-screen slurry operating conditions, identify process risk flags, and calculate preliminary Darcy throughput before submitting an engineering RFQ.
1. Slurry & Operating Conditions
7.0
45 °C
40 %
2. Machine Kinetics & Current Issue
25 mm
-60 kPa
12 m/min
1. Known Operating Parameters
2. Missing for Engineering Review
3. Process Risk Flags
4. Possible Technical Direction
Filtration Kinetics & Darcy Flux Assessment
q = ΔP / [μ · (r0 · w + Rm)] Theoretical Cake Throughput Not calculated Requires measured cake resistance (α) and medium resistance (Rm)
Calculation Confidence Insufficient process data Specific cake resistance and filtrate viscosity unmeasured
Engineering Review Boundary Test Data Required Throughput depends on slurry compressibility and particle distribution
*Pre-screening evaluates chemistry, temperature limits, and observed failure modes. Throughput cannot be simulated reliably without bench-scale Buchner funnel or pilot plant filtration test data.